Source: docs/lotus-v2/research/plans/lotus-v2-artifacts-plan.md
Research — non-normative. This page records an investigation. It defines no rule; a research result enters the specification only through a decision recorded in decision history.

Lotus development plan

Updated October 14, 2026. The restored V2 implementation and launch plan owns milestones V2-00–V2-07, V1 patch reuse, miner/pool changes, SDK/wallet/indexer integration, genesis construction and release gates.

V1 remains independently maintained. V2 is a separate chain with its own six-patch series on pinned ABC 8c67fe1e85a602204a2ce65aa3b643469c2c3a1d; it selectively carries forward verified V1 behavior rather than applying that series over the complete V1 stack. The implementation plan records the corrected V1 reference and distinguishes reported V1 validation from unexecuted V2 gates.

Sequence and release gates

Stage Milestone Gate
Source provenance and implementation profile V2-00 Exact ABC/V1/V2 references, accepted candidate requirements, explicit open parameters
Independent reference and daemon payment slice V2-01–V2-02 Parser/signature vectors, disposable development genesis, payment/block/root/undo agreement
Assets, VM and monetary/state behavior V2-03–V2-05 Complete integrated validity, resource/reward accounting and state restoration
Miner/pool and optimization V2-06 CPU/GPU tagged-BLAKE3 agreement, actual accepted development blocks and measured resource behavior
Ecosystem and launch qualification V2-07 Wallet/indexer/node agreement, all genesis decisions closed, independently reproduced final genesis and release

Development-chain genesis construction starts at V2-02. Final mainnet genesis follows parameter freeze and independent review. Spec/reference work does not require waiting for publication of a V1 release; promoting shared daemon changes requires their recorded regression evidence.

Compiler and dogfooding

The compiler and ABI plan scopes CABI-00–CABI-06 alongside protocol implementation. It turns the worked contracts into reproducible bytecode, generated call bindings and independent execution/stress tests; the language and schema remain proposed.

Artifact ownership

The former combined spec and patch strategy are archived historical sources. Their old “locked,” “DONE,” output-layout and performance claims do not override current status. The external Master Genesis Plan artifact now points to the repository documents rather than maintaining another editable specification. V1 historical rules remain compatibility evidence; v2 proposals do not alter them.

Current completion and remaining work

The older implementation entry contracts remain useful bounded work descriptions; their source-routing contract is updated to match the current series. Historical incident/faster-machine drafts are not evidence that current V1 validation has not occurred. This planning update performs no daemon build, live sync, economic simulation or launch.